estimations
英 [ˌɛstɪˈmeɪʃənz]
美 [ˌɛstəˈmeɪʃənz]
n. 判断; 评价; 看法; (对水平、数量等的)估计
estimation的复数
柯林斯词典
- N-SING 评价;看法;判断
Yourestimationof a person or situation is the opinion or impression that you have formed about them.- He has gone down considerably in my estimation.
我对他的评价已经一落千丈。 - ...Lee Dixon, the best player on the pitch in his manager's estimation.
教练心目中球场上最好的球员李·狄克逊
- He has gone down considerably in my estimation.
- N-COUNT 估算;估价
Anestimationis an approximate calculation of a quantity or value.- In fact, the first group were absolutely correct in their estimation of this man's height.
事实上,第一组人对这名男子身高的估计完全正确。 - ...estimations of pre-tax profits of £2.25 million.
估计税前利润达225万英镑
- In fact, the first group were absolutely correct in their estimation of this man's height.
双语例句
- No plans, no estimations, no iterations, no overhead – There is no silver bullet and no alternative to hard work, discipline, target on perfection and constant improvements.
没有计划、没有估算、没有迭代、没有管理开销&从来不存在银弹,而且除了努力工作、纪律、追求完美和持续改进之外,别无他法。 - High variances in the estimations of project parameters are therefore high risks to the project, and early reduction of these variances is important for the project.
因而项目参数估计中的高方差对项目来说是高风险的,尽早减少这些方差对项目来说是重要的。 - The rotor angular velocity is calculated with the observed estimations, including the rotor angular velocity, to realize the speed sensorlesss control.
并用含转子角转速的观测估计值算出转子角转速,实现了无速度传感器控制。 - The Kalman Filtering and Optimal Smoothing Estimations for Gyro Drift
陀螺漂移的卡尔曼滤波和最优平滑估计 - Finally, the estimations of the two-dimensional ( 2-D) transmit-receive central azimuths are obtained by using the property.
最后,利用该特性得到了对目标2维收发中心方位角的估计。 - This reduction in uncertainty also reduces the variance in estimations, since there is a direct correlation between these factors and the ability to produce sound estimates.
这种不确定性的削减还减少了估计中的变化,因为在这些因素和生成可靠估值的能力之间存在直接的关联。 - Some Notes on Convergence Rates for Error Variance Estimations in Linear Models
关于线性模型中误差方差估计的收敛速度的若干注记 - Thus, with UCPM user acceptance or systems integration, teams will be able generate more accurate estimations much earlier than the other test phases.
因此,有了UCPM用户的验证或者系统的整合,团队就能够生成更精确的比其它测试阶段更早的评估。 - Cost estimations for various schemes do not include preliminary items and the caisson units.
每个方案的估价不包括开办费用和海堤沉箱的价钱。 - A priori point-wise estimations are established for bounded functions satisfying a new class of nonlinear inequalities involving improper integrals.
对满足一类新的含反常积分非线性不等式的有界函数建立了先验逐点估计。